Fresh off a sales win. Drafting hasn't finished yet, so nothing here is ready to lock down.
Drafting's done. Still waiting on Cody to lock in manufacturing and/or the install/pickup/delivery date.
Manufacturing and install/pickup/delivery are both locked. Safe to promise the customer.
These control how the calendar computes deadlines and capacity. Adjust anytime as the shop grows.
This is the one place drafting hours, manufacturing duration, and install days are set — a bigger job can take longer than a smaller one of the same category. A job's value comes from its linked Sales App contract, or from the "Job value" field for jobs scheduled directly here; with no price on file, or no tier covering a category yet, a job falls back to old flat defaults (frozen at today's numbers). Leave Max blank for "and up."
| Category | Min $ | Max $ | Drafting hrs | Mfg duration (days) | Install days |
|---|
How far ahead of install drafting and manufacturing must be *finished*, per category. This is a scheduling safety margin, not actual work duration, so it stays flat per category rather than price-tiered.
| Category | Drafting lead days | Manufacturing days |
|---|
Add a crew for each install team. Assign markets as you expand to new towns.
Holidays and planned shutdowns. These count like weekends — no chips land here, deadlines skip over them, and dragging a job onto one bumps it to the next open day.